Sinosteel Luonai Simple Warehouse Construction Project EPC Contract
Sinosteel Luonai Simple Warehouse Construction Project EPC Contract
Project Location: No. 1 Luonai Avenue, Yichuan County, Luoyang City
Building Area: 12,160 m²
Building Height: 7.67 m
Total Construction Period: 60 Days
Main Structure Type: Portal Frame
Number of Above-Ground Floors: 1 Floor
Number of Underground Floors: None
Project Location: No. 1 Luonai Avenue, Yichuan County, Luoyang City
Building Area: 12,160 m²
Building Height: 7.67 m
Total Construction Period: 60 Days
Main Structure Type: Portal Frame
Number of Above-Ground Floors: 1 Floor
Number of Underground Floors: None
Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1
Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1: Steel Structure Works for Plant 3#, 4#, and 5#
Project Location: South of Hongxing East Street, West of Planning Jingsan Road (Dongshu Area), Jincheng City
Building Area: 9,252 m²
Building Height: 9 m
Total Construction Period: 90 Days
Main Structure Type: Portal Frame
Number of Above-Ground Floors: 1 Floor
Number of Underground Floors: None
Project Location: South of Hongxing East Street, West of Planning Jingsan Road (Dongshu Area), Jincheng City
Building Area: 9,252 m²
Building Height: 9 m
Total Construction Period: 90 Days
Main Structure Type: Portal Frame
Number of Above-Ground Floors: 1 Floor
Number of Underground Floors: None
Sanon New Material Technology (Luoyang) Co., Ltd.
Project Scale:
Upon completion, the plant will produce 60,000 tons per year of high-performance extractants.
Total Investment: 600 million RMB
Upon completion, the plant will produce 60,000 tons per year of high-performance extractants.
Total Investment: 600 million RMB
Luoyang Huijing New Material Technology Co., Ltd.
Project Overview:This steel structure project spans from axis 1-1 to 1-20 (North to South) and axis 1-A to 1-G (West to East).
Luoyang Bearing Research Institute Project
Building Area: 17,451.30 m²
Building Height: 13.60 m
Total Construction Period: 210 Days
Main Structure Type: Portal Frame Structure
Number of Above-Ground Floors: 1 Floor
Number of Underground Floors: None
Building Height: 13.60 m
Total Construction Period: 210 Days
Main Structure Type: Portal Frame Structure
Number of Above-Ground Floors: 1 Floor
Number of Underground Floors: None
Yoshida New Materials Phase I Plant Project
Total Area: 17,000 m²
Plant 4# & 5#: 6,000 m² each
Construction Location: Nancun Town, Zezhou County, Jincheng City
Structural Form: Light Steel Structure, Portal Frame
Frame Type: Three-span, six-slope roof
Eave Height: 11.30 m
Total Length: 83.40 m
Total Width: 72.70 m
Roof Slope: 1:20
Foundation Type: Reinforced Concrete Independent Foundation
Plant 2# & 3#: 2,500 m² each
Material Specifications:
Portal Frame: C355B Grade Steel
Bracing, Purlins, Wall Girts, Channel Steel, Angle Steel, Round Steel: Q235B Grade Steel
Unspecified Steel Components: Same as Portal Frame (C355B)
Plant 4# & 5#: 6,000 m² each
Construction Location: Nancun Town, Zezhou County, Jincheng City
Structural Form: Light Steel Structure, Portal Frame
Frame Type: Three-span, six-slope roof
Eave Height: 11.30 m
Total Length: 83.40 m
Total Width: 72.70 m
Roof Slope: 1:20
Foundation Type: Reinforced Concrete Independent Foundation
Plant 2# & 3#: 2,500 m² each
Material Specifications:
Portal Frame: C355B Grade Steel
Bracing, Purlins, Wall Girts, Channel Steel, Angle Steel, Round Steel: Q235B Grade Steel
Unspecified Steel Components: Same as Portal Frame (C355B)

WeChat