  • PU-Panel-BRD-800-800-(3).jpg
  • b1bb83bdf98f59753b08b0696b887707_pic2026-01-06_07-14-14.png
  • 08f2b3743f9a8dd9991c0a59358e6e84_pic2026-01-06_07-14-21.png
  • d649a5cf42ecf35fa9ff49d76cf67b3f_pic2026-01-06_07-14-15.png
  • 08bb4690bbf192e8b86cd0baa6bfa86c_pic2026-01-06_07-14-18.png

Rock Mineral Wool Wall Panel Sandwich Panel

Rock wool sandwich panels use rock wool as the core material, meeting the most stringent fire protection requirements while also possessing the necessary thermal insulation performance and good load-bearing capacity. Rock wool sandwich panels are made primarily from natural minerals such as basalt, which are melted into fibers at high temperatures and then cured with an appropriate amount of binder. Rock wool sandwich panel products are suitable for thermal and sound insulation in industrial equipment, buildings, and ships.

Details

1, First of all, it must carry on the construction preparation before installation, include personnel, materials, etc. All will be well prepared.

2, Before the installation of wall panel, it should check whether the verticality and levelness of metope purlin installation requirements, wall frame column vertical degree meets the requirement.

3, Before installation polyurethane wall panel, it should first mounting plate bottom water retaining plate and the bottom of the window to block water board, water retaining plate and wall frame beam connection with self tapping screw fixation.

4, Polyurethane wall panel links with ground.

Lateral links: fixed polyurethane sandwich panel with the ground at the other end of the round hole with steel frame fixed, connection between the two plate mouth involution, if occurrence crack of the connectors available heat preservation to fill.

Vertical links: the gap between plates, using the dedicated button concave groove in the fixed wall panel.

 

Material Application:

1.Thickness of upper/lower steel plate: 0.4 – 0.8mm color-coated steel plate
2. Core material: Rock (slag) wool density is 120-160 kg/cubic meter
3. Side steel band: With steel band
In cold regions, cold bridges must not exist.
 

Product Specifications:

  • Rock Mineral Wool = high fire resistance
  • The rock wool insulating core has high fire resistance and excellent sound insulation. Wall sandwich panels with a mineral wool insulation core offer high fire resistance and thermal insulation properties.
  • Rock Mineral Wool insulation core
  • High fire resistance
  • Vertical or horizontal installation
  • Standard lengths are from 2 m to 10 m (max. 12 m)
  • Thickness of insulation core 50, 75, 100, 125, 150, and 200 mm

 


 

Rock Mineral Wool Wall Panel Sandwich Panel

Other Products

Sinosteel Luonai Simple Warehouse Construction Project EPC Contract

Sinosteel Luonai Simple Warehouse Construction Project EPC Contract

Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1

Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1: Steel Structure Works for Plant 3#, 4#, and 5#

Sanon New Material Technology (Luoyang) Co., Ltd.

Project Scale:Upon completion, the plant will produce 60,000 tons per year of high-performance extractants.

Luoyang Huijing New Material Technology Co., Ltd.

Project Overview:This steel structure project spans from axis 1-1 to 1-20 (North to South) and axis 1-A to 1-G (West to East).

Yoshida New Materials Phase I Plant Project

Total Area: 17,000 m²
Plant 4# & 5#: 6,000 m² each

Luoyang Bearing Research Institute Project

Building Area: 17,451.30 m²
Building Height: 13.60 m

Luoyang LYC Bearing Co., Ltd. Project Case

Construction area : Luoyang
Construction area : 17451.3㎡
construction period : 30 weeks

Case Study of a 30,000-square-meter Steel Structure Factory

Construction area : Zhejiang
Construction area : 30000㎡
construction period : 26 weeks

Case of Zhecheng Artificial Cultured Diamond Steel Structure Factory: The Integration of Innovation and Efficiency

Construction area : Zhejiang
Construction area : 26500㎡
construction period : 16 weeks

Light Steel Villa

Construction area : South Africa
Construction area : 320㎡
construction period : 8 weeks

Metal Carport Kits

Construction area : Indonesia
Construction area : 120㎡
construction period : 1 week

Large Span Prefabricated Warehouse Steel Structure Aircraft Hangar

Construction area : Spain
Construction area : 1000㎡
construction period : 22 weeks

I want to inquire

During your browsing of our products, is there anything that you find particularly satisfactory or that needs improvement? Your inquiries or suggestions will directly help us improve product and service quality, bringing you a more intimate experience.

Submit

* Please fill in the above fields (* indicates required fields), and we will reply to your feedback as soon as possible.