Magnesium oxide purification board

Magnesium Oxide Fireproof Cleanroom Board:
1. Core material thickness: 50mm
2. Effective width: 1150mm
3. Steel plate thickness: 0.326/0.376/0.426/0.476mm

Details

1. Composed of magnesium oxide, magnesium chloride, fiberglass cloth, talc, sawdust, perlite, modifiers, etc.

2. It is currently the material with the highest fire resistance among decorative panels.

Because the magnesium oxide and magnesium chloride in the magnesium oxide board have strong gelling properties when mixed with water, they can bond tightly with fiberglass cloth, hence the name “inorganic fiberglass.”

3. The use of lightweight aggregates such as sawdust and perlite reduces the product’s weight while simultaneously improving the board’s nail-holding power.

Magnesium oxide purification board

Other Products

Sinosteel Luonai Simple Warehouse Construction Project EPC Contract

Sinosteel Luonai Simple Warehouse Construction Project EPC Contract

Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1

Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1: Steel Structure Works for Plant 3#, 4#, and 5#

Sanon New Material Technology (Luoyang) Co., Ltd.

Project Scale:Upon completion, the plant will produce 60,000 tons per year of high-performance extractants.

Luoyang Huijing New Material Technology Co., Ltd.

Project Overview:This steel structure project spans from axis 1-1 to 1-20 (North to South) and axis 1-A to 1-G (West to East).

Yoshida New Materials Phase I Plant Project

Total Area: 17,000 m²
Plant 4# & 5#: 6,000 m² each

Luoyang Bearing Research Institute Project

Building Area: 17,451.30 m²
Building Height: 13.60 m

Luoyang LYC Bearing Co., Ltd. Project Case

Construction area : Luoyang
Construction area : 17451.3㎡
construction period : 30 weeks

Case Study of a 30,000-square-meter Steel Structure Factory

Construction area : Zhejiang
Construction area : 30000㎡
construction period : 26 weeks

Case of Zhecheng Artificial Cultured Diamond Steel Structure Factory: The Integration of Innovation and Efficiency

Construction area : Zhejiang
Construction area : 26500㎡
construction period : 16 weeks

Light Steel Villa

Construction area : South Africa
Construction area : 320㎡
construction period : 8 weeks

Metal Carport Kits

Construction area : Indonesia
Construction area : 120㎡
construction period : 1 week

Large Span Prefabricated Warehouse Steel Structure Aircraft Hangar

Construction area : Spain
Construction area : 1000㎡
construction period : 22 weeks

I want to inquire

During your browsing of our products, is there anything that you find particularly satisfactory or that needs improvement? Your inquiries or suggestions will directly help us improve product and service quality, bringing you a more intimate experience.

Submit

* Please fill in the above fields (* indicates required fields), and we will reply to your feedback as soon as possible.