Luoyang Bearing Research Institute Project
Building Height: 13.60 m
Total Construction Period: 210 Days
Main Structure Type: Portal Frame Structure
Number of Above-Ground Floors: 1 Floor
Number of Underground Floors: None
Category:
Details
Building Area: 17,451.30 m²
Building Height: 13.60 m
Total Construction Period: 210 Days
Main Structure Type: Portal Frame Structure
Number of Above-Ground Floors: 1 Floor
Number of Underground Floors: None
Project Overview:
This steel structure project comprises the Main Shaft, Gearbox Bearing & Roller Workshop.
Seismic & Safety Design:
- Basic Seismic Intensity: 7 Degrees
- Seismic Fortification Category: Category C
- Fortification Intensity: 7 Degrees
- Design Basic Seismic Acceleration Value: 0.10g
- Design Seismic Group: Second Group
- Seismic Grade: Grade 4
- Construction Site Category: Class II
- Characteristic Period: 0.4s
- Production Fire Hazard Classification: Class E
- Fire Resistance Rating: Grade II
- Roof Waterproofing Grade: Grade I
- Waterproofing Membrane: 1.5mm thick Polyester fabric reinforced (Type P) TPO waterproofing membrane, installed via mechanical fastening method.
- External Wall: 80mm thick rock wool sandwich panel (fire resistance limit 0.5h); inner and outer layers made of aluminum-zinc coated steel sheet.
Structural Materials:
- Steel Grades: Q235 Steel, Q355 Steel
Workshop Dimensions & Structure:
- Type: Single-story steel structure workshop
- Longitudinal Length: 162.00 m
- Transverse Width: 96.00 m
- Building Height: 13.60 m (average height from outdoor ground to eave and ridge)
- Span: 24.000 m
- Foundation Type: Independent Foundation
Luoyang Bearing Research Institute Project
Next:
Other Products
Sinosteel Luonai Simple Warehouse Construction Project EPC Contract
Sinosteel Luonai Simple Warehouse Construction Project EPC Contract
Project Location: No. 1 Luonai Avenue, Yichuan County, Luoyang City
Building Area: 12,160 m²
Building Height: 7.67 m
Total Construction Period: 60 Days
Main Structure Type: Portal Frame
Number of Above-Ground Floors: 1 Floor
Number of Underground Floors: None
Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1
Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1: Steel Structure Works for Plant 3#, 4#, and 5#
Project Location: South of Hongxing East Street, West of Planning Jingsan Road (Dongshu Area), Jincheng City
Building Area: 9,252 m²
Building Height: 9 m
Total Construction Period: 90 Days
Main Structure Type: Portal Frame
Number of Above-Ground Floors: 1 Floor
Number of Underground Floors: None
Sanon New Material Technology (Luoyang) Co., Ltd.
Project Scale:
Upon completion, the plant will produce 60,000 tons per year of high-performance extractants.
Total Investment: 600 million RMB
Luoyang Huijing New Material Technology Co., Ltd.
Project Overview:This steel structure project spans from axis 1-1 to 1-20 (North to South) and axis 1-A to 1-G (West to East).
Yoshida New Materials Phase I Plant Project
Total Area: 17,000 m²
Plant 4# & 5#: 6,000 m² each
Construction Location: Nancun Town, Zezhou County, Jincheng City
Structural Form: Light Steel Structure, Portal Frame
Frame Type: Three-span, six-slope roof
Eave Height: 11.30 m
Total Length: 83.40 m
Total Width: 72.70 m
Roof Slope: 1:20
Foundation Type: Reinforced Concrete Independent Foundation
Plant 2# & 3#: 2,500 m² each
Material Specifications:
Portal Frame: C355B Grade Steel
Bracing, Purlins, Wall Girts, Channel Steel, Angle Steel, Round Steel: Q235B Grade Steel
Unspecified Steel Components: Same as Portal Frame (C355B)
Luoyang Bearing Research Institute Project
Building Area: 17,451.30 m²
Building Height: 13.60 m
Total Construction Period: 210 Days
Main Structure Type: Portal Frame Structure
Number of Above-Ground Floors: 1 Floor
Number of Underground Floors: None
Luoyang LYC Bearing Co., Ltd. Project Case
Building Area (m2): 17451.30
Building Height (m): 13.60m
Total Construction Period (days): 210
Main Structure Type: Portal Steel Frame Structure
Number of Floors Above Ground: 1
Case Study of a 30,000-square-meter Steel Structure Factory
Construction area : Zhejiang
Construction area : 30000㎡
construction period : 26 weeks
Construction area : Zhejiang
Construction area : 26500㎡
construction period : 16 weeks
Construction area : Indonesia
Construction area : 120㎡
construction period : 1 week
Large Span Prefabricated Warehouse Steel Structure Aircraft Hangar
Construction area : Spain
Construction area : 1000㎡
construction period : 22 weeks
Our C & Z purlin serves as fundamental structural elements crucial for providing support in construction projects. These purlins are meticulously engineered from robust materials, ensuring optimal strength and stability for roofing and wall systems. Available in a range of sizes and configurations, they offer versatility to accommodate diverse construction requirements. With their durable construction, our C & Z purlin guarantees dependable support and enhances the overall structural integrity of your building projects.
I want to inquire
During your browsing of our products, is there anything that you find particularly satisfactory or that needs improvement? Your inquiries or suggestions will directly help us improve product and service quality, bringing you a more intimate experience.
* Please fill in the above fields (* indicates required fields), and we will reply to your feedback as soon as possible.

WeChat