+
  • 5e1953a8f9a976bb0b4ecb4d7372b39f_pic2026-01-06_08-44-51.webp
  • 32cf71f6f436912adfdfacec4a2902e9_pic2026-01-06_08-44-50.webp
  • 51ccf99eee157768da6b2f3e3a1bc5ec_pic2026-01-14_00-27-44-1.webp

Large Span Prefabricated Warehouse Steel Structure Aircraft Hangar

Construction area : Spain
Construction area : 1000㎡
construction period : 22 weeks

Category:

Details

Name

aircraft hangar

Clear span

6~50m without middle column

Height

20-50m

Length

as your requirement

Material Grade

Q355(S355JR)or Q235(S235JR) steel or as request

Column & Rafter

Welded or Hot rolled H beam

Tie beam

round pipe or square tube or as request

X brace

round steel bar,angle steel or as request

Purlin

C purlin, Z purlin,thickness2.0mm,2.2mm,2.5mm,3.0mm

Gate

Electric roller shutter door
Multitrack Sliding door clear open

Wall & Roof

single corrugated steel sheet (0.3~0.8mm)
EPS, mineral wool, PU sandwich Panel
(Thickness:50mm,75mm,100mm,150mm,200mm)

Exit Door

Plastic steel swing door
Aluminum alloy swing door
steel swing door

Window

Plastic steel sliding window
Aluminum alloy sliding window

Surface

Shot blasting with anti rust paint
hot dip galvanize

Other accessories

gutter,flash trimming cover,down spout, ventilation fitting,
skylight belt,bolt, anchor bolt, self tapping screw etc

 

Product Advantages

High strength and durability: Steel has extremely high strength and can withstand greater loads than traditional building materials such as masonry, wood, etc. This allows the steel structure parking hangar to remain stable in the face of various natural environments and dynamic loads generated during aircraft parking and maintenance. In some windy and snowy areas, steel structure hangars effectively withstand strong winds and heavy snow and ensure aircraft safety thanks to their solid structure. Moreover, the steel has good durability and can be used for a long time after appropriate anti-rust treatment, reducing frequent maintenance and replacement costs.

Good seismic performance: The flexibility and ductility of steel structures enable them to absorb and dissipate seismic energy through their own deformation when an earthquake occurs, reducing the risk of structural collapse. For airports located in earthquake zones, steel hangars provide a more reliable shelter for aircraft and related equipment, greatly improving the survivability of facilities in earthquake disasters.​

 

Product Application

Civil Aviation airport Aircraft parking and maintenance: At busy civil aviation airports, a large number of passenger aircraft take off and land every day. Steel hangars provide safe and stable parking space for these passenger aircraft. Its large-span design can easily accommodate different types of civil passenger aircraft, whether it is narrow-body or wide-body passenger aircraft, it can be parked in an orderly manner. At the same time, the spacious interior space facilitates daily maintenance work of the aircraft. From fuselage cleaning, parts inspection to engine maintenance, all types of maintenance operations can be carried out efficiently in the hangar. For example, at large hub airports, the apron area composed of multiple steel hangars ensures the proper parking and timely maintenance of many flights and ensures normal flight operations.​

 

Large Span Prefabricated Warehouse Steel Structure Aircraft Hangar

Other Products

Sinosteel Luonai Simple Warehouse Construction Project EPC Contract

Sinosteel Luonai Simple Warehouse Construction Project EPC Contract

Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1

Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1: Steel Structure Works for Plant 3#, 4#, and 5#

Sanon New Material Technology (Luoyang) Co., Ltd.

Project Scale:Upon completion, the plant will produce 60,000 tons per year of high-performance extractants.

Luoyang Huijing New Material Technology Co., Ltd.

Project Overview:This steel structure project spans from axis 1-1 to 1-20 (North to South) and axis 1-A to 1-G (West to East).

Yoshida New Materials Phase I Plant Project

Total Area: 17,000 m²
Plant 4# & 5#: 6,000 m² each

Luoyang Bearing Research Institute Project

Building Area: 17,451.30 m²
Building Height: 13.60 m

Luoyang LYC Bearing Co., Ltd. Project Case

Construction area : Luoyang
Construction area : 17451.3㎡
construction period : 30 weeks

Case Study of a 30,000-square-meter Steel Structure Factory

Construction area : Zhejiang
Construction area : 30000㎡
construction period : 26 weeks

Case of Zhecheng Artificial Cultured Diamond Steel Structure Factory: The Integration of Innovation and Efficiency

Construction area : Zhejiang
Construction area : 26500㎡
construction period : 16 weeks

Light Steel Villa

Construction area : South Africa
Construction area : 320㎡
construction period : 8 weeks

Metal Carport Kits

Construction area : Indonesia
Construction area : 120㎡
construction period : 1 week

Large Span Prefabricated Warehouse Steel Structure Aircraft Hangar

Construction area : Spain
Construction area : 1000㎡
construction period : 22 weeks

I want to inquire

During your browsing of our products, is there anything that you find particularly satisfactory or that needs improvement? Your inquiries or suggestions will directly help us improve product and service quality, bringing you a more intimate experience.

Submit

* Please fill in the above fields (* indicates required fields), and we will reply to your feedback as soon as possible.