Case Study of a 30,000-square-meter Steel Structure Factory
Construction area : 30000㎡
construction period : 26 weeks
Category:
Details
The plant is located in the core area of Zhecheng County Industrial Park, with a superior geographical location and convenient transportation, which is convenient for raw material procurement and product distribution. The plant design fully integrates modern industrial aesthetics and practicality. It adopts a high-strength steel structure frame, with lightweight and durable color steel plate walls and roofs, which not only ensures the stability of the structure, but also achieves good thermal insulation and waterproof performance, providing an ideal environment for the storage and processing of peppers.
Taking into account the particularity of the pepper processing industry, the internal layout of the plant has been carefully planned and divided into multiple functional areas such as raw material storage area, pretreatment area, deep processing area, packaging and warehousing area, and quality inspection and R&D center. The raw material storage area is equipped with large-capacity refrigeration facilities to ensure that fresh peppers are preserved in the best condition; the pre-treatment area is equipped with advanced cleaning, cutting and grading equipment to improve the efficiency of raw material processing; the deep processing area concentrates on a series of automated production lines such as mixing, frying, seasoning, and drying, achieving seamless connection from raw materials to finished products; the packaging and storage area adopts an intelligent storage management system to ensure efficient distribution and storage of products.
It is particularly worth mentioning that the factory building fully incorporates the concept of environmental protection during the design and construction process, and adopts green technologies such as energy-saving lamps, rainwater collection systems, and solar panels to reduce energy consumption and environmental impact, demonstrating the company’s commitment to sustainable development.
Since the factory building was put into operation, it has not only greatly improved the company’s pepper processing capacity, but also attracted the attention and cooperation of many upstream and downstream companies, effectively promoting the extension and upgrading of the Zhecheng pepper industry chain. This 30,000-square-meter steel structure factory building has become a bright business card for the pepper industry in Zhecheng County and even Henan Province, and has made important contributions to promoting local economic development and increasing farmers’ income.
In the future, with the introduction of more advanced technologies and management concepts, this factory will continue to play its leading role in the pepper industry, help Zhecheng pepper enter a broader market, and write a new chapter in China’s pepper industry.
Case Study of a 30,000-square-meter Steel Structure Factory
Other Products
Sinosteel Luonai Simple Warehouse Construction Project EPC Contract
Sinosteel Luonai Simple Warehouse Construction Project EPC Contract
Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1
Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1: Steel Structure Works for Plant 3#, 4#, and 5#
Sanon New Material Technology (Luoyang) Co., Ltd.
Project Scale:Upon completion, the plant will produce 60,000 tons per year of high-performance extractants.
Luoyang Huijing New Material Technology Co., Ltd.
Project Overview:This steel structure project spans from axis 1-1 to 1-20 (North to South) and axis 1-A to 1-G (West to East).
Yoshida New Materials Phase I Plant Project
Total Area: 17,000 m²
Plant 4# & 5#: 6,000 m² each
Luoyang Bearing Research Institute Project
Building Area: 17,451.30 m²
Building Height: 13.60 m
Luoyang LYC Bearing Co., Ltd. Project Case
Construction area : Luoyang
Construction area : 17451.3㎡
construction period : 30 weeks
Case Study of a 30,000-square-meter Steel Structure Factory
Construction area : Zhejiang
Construction area : 30000㎡
construction period : 26 weeks
Construction area : Zhejiang
Construction area : 26500㎡
construction period : 16 weeks
Construction area : South Africa
Construction area : 320㎡
construction period : 8 weeks
Construction area : Indonesia
Construction area : 120㎡
construction period : 1 week
Large Span Prefabricated Warehouse Steel Structure Aircraft Hangar
Construction area : Spain
Construction area : 1000㎡
construction period : 22 weeks
I want to inquire
During your browsing of our products, is there anything that you find particularly satisfactory or that needs improvement? Your inquiries or suggestions will directly help us improve product and service quality, bringing you a more intimate experience.
* Please fill in the above fields (* indicates required fields), and we will reply to your feedback as soon as possible.

WeChat