Project Overview:
This steel structure project spans from axis 1-1 to 1-20 (North to South) and axis 1-A to 1-G (West to East).
Dimensions:
- North-South Length: 149.7 m (Column spacing: 7.8 m)
- East-West Width: 52.90 m
Structural Components:
- Maximum Single H-Shaped Steel Column Component Weight: 6.9 tons
- Maximum Component Height: 17.8 m
- Structure Type: Single-story steel structure industrial workshop
- Number of Above-Ground Floors: 1 Floor
- Foundation Type: Independent Foundation
Column Connections:
- Main H-Shaped Steel Columns: Connected via a cup-type connection embedded within the top surface of the concrete cup foundation, with cast-in-place reinforced concrete for rigid fixation.
- Wind-Resistant Columns: Connected to the independent foundation via anchor bolts at the top surface.
Materials & Finishing:
- Steel Grade: Q355 / Q235
- Surface Preparation / Derusting Grade: Sa 2.5级 (Near-White Metal Blast Cleaning)
Luoyang Huijing New Material Technology Co., Ltd.
Other Products
Sinosteel Luonai Simple Warehouse Construction Project EPC Contract
Sinosteel Luonai Simple Warehouse Construction Project EPC Contract
Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1
Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1: Steel Structure Works for Plant 3#, 4#, and 5#
Sanon New Material Technology (Luoyang) Co., Ltd.
Project Scale:Upon completion, the plant will produce 60,000 tons per year of high-performance extractants.
Luoyang Huijing New Material Technology Co., Ltd.
Project Overview:This steel structure project spans from axis 1-1 to 1-20 (North to South) and axis 1-A to 1-G (West to East).
Yoshida New Materials Phase I Plant Project
Total Area: 17,000 m²
Plant 4# & 5#: 6,000 m² each
Luoyang Bearing Research Institute Project
Building Area: 17,451.30 m²
Building Height: 13.60 m
Luoyang LYC Bearing Co., Ltd. Project Case
Construction area : Luoyang
Construction area : 17451.3㎡
construction period : 30 weeks
Case Study of a 30,000-square-meter Steel Structure Factory
Construction area : Zhejiang
Construction area : 30000㎡
construction period : 26 weeks
Construction area : Zhejiang
Construction area : 26500㎡
construction period : 16 weeks
Construction area : South Africa
Construction area : 320㎡
construction period : 8 weeks
Construction area : Indonesia
Construction area : 120㎡
construction period : 1 week
Large Span Prefabricated Warehouse Steel Structure Aircraft Hangar
Construction area : Spain
Construction area : 1000㎡
construction period : 22 weeks
I want to inquire
During your browsing of our products, is there anything that you find particularly satisfactory or that needs improvement? Your inquiries or suggestions will directly help us improve product and service quality, bringing you a more intimate experience.
* Please fill in the above fields (* indicates required fields), and we will reply to your feedback as soon as possible.

WeChat