Project Overview:This steel structure project spans from axis 1-1 to 1-20 (North to South) and axis 1-A to 1-G (West to East).

Category:

Details

Project Overview:
This steel structure project spans from axis 1-1 to 1-20 (North to South) and axis 1-A to 1-G (West to East).

 

Dimensions:

  • North-South Length: 149.7 m (Column spacing: 7.8 m)
  • East-West Width: 52.90 m

 

Structural Components:

  • Maximum Single H-Shaped Steel Column Component Weight: 6.9 tons
  • Maximum Component Height: 17.8 m
  • Structure Type: Single-story steel structure industrial workshop
  • Number of Above-Ground Floors: 1 Floor
  • Foundation Type: Independent Foundation

 

Column Connections:

  • Main H-Shaped Steel Columns: Connected via a cup-type connection embedded within the top surface of the concrete cup foundation, with cast-in-place reinforced concrete for rigid fixation.
  • Wind-Resistant Columns: Connected to the independent foundation via anchor bolts at the top surface.

 

Materials & Finishing:

  • Steel Grade: Q355 / Q235
  • Surface Preparation / Derusting Grade: Sa 2.5级 (Near-White Metal Blast Cleaning)

 

Luoyang Huijing New Material Technology Co., Ltd.

Other Products

Sinosteel Luonai Simple Warehouse Construction Project EPC Contract

Sinosteel Luonai Simple Warehouse Construction Project EPC Contract

Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1

Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1: Steel Structure Works for Plant 3#, 4#, and 5#

Sanon New Material Technology (Luoyang) Co., Ltd.

Project Scale:Upon completion, the plant will produce 60,000 tons per year of high-performance extractants.

Luoyang Huijing New Material Technology Co., Ltd.

Project Overview:This steel structure project spans from axis 1-1 to 1-20 (North to South) and axis 1-A to 1-G (West to East).

Yoshida New Materials Phase I Plant Project

Total Area: 17,000 m²
Plant 4# & 5#: 6,000 m² each

Luoyang Bearing Research Institute Project

Building Area: 17,451.30 m²
Building Height: 13.60 m

Luoyang LYC Bearing Co., Ltd. Project Case

Construction area : Luoyang
Construction area : 17451.3㎡
construction period : 30 weeks

Case Study of a 30,000-square-meter Steel Structure Factory

Construction area : Zhejiang
Construction area : 30000㎡
construction period : 26 weeks

Case of Zhecheng Artificial Cultured Diamond Steel Structure Factory: The Integration of Innovation and Efficiency

Construction area : Zhejiang
Construction area : 26500㎡
construction period : 16 weeks

Light Steel Villa

Construction area : South Africa
Construction area : 320㎡
construction period : 8 weeks

Metal Carport Kits

Construction area : Indonesia
Construction area : 120㎡
construction period : 1 week

Large Span Prefabricated Warehouse Steel Structure Aircraft Hangar

Construction area : Spain
Construction area : 1000㎡
construction period : 22 weeks

I want to inquire

During your browsing of our products, is there anything that you find particularly satisfactory or that needs improvement? Your inquiries or suggestions will directly help us improve product and service quality, bringing you a more intimate experience.

Submit

* Please fill in the above fields (* indicates required fields), and we will reply to your feedback as soon as possible.