Sinosteel Luonai Simple Warehouse Construction Project EPC Contract
Category:
Details
Sinosteel Luonai Simple Warehouse Construction Project EPC Contract
Project Location: No. 1 Luonai Avenue, Yichuan County, Luoyang City
- Building Area: 12,160 m²
- Building Height: 7.67 m
- Total Construction Period: 60 Days
- Main Structure Type: Portal Frame
- Number of Above-Ground Floors: 1 Floor
- Number of Underground Floors: None
Project Stakeholders:
- Construction Unit: Sinosteel Luonai Technology Co., Ltd.
- Design Unit: Shanghai Chuancheng Bohua Architectural Design Co., Ltd.
- Supervision Unit: Luoyang Planning & Architectural Design Research Institute Co., Ltd.
- Survey Unit: [Not Specified]
- Construction Contractor: Henan Yintian Construction Engineering Co., Ltd.
Structural & Design Specifications:
This structure is a light steel structure using a portal frame system.
- Seismic Fortification Intensity: 7 Degrees
- Seismic Fortification Category: Category C
- Safety Grade of Building Structure: Grade II
- Design Grade of Foundation: Grade C
- Fire Protection Classification: Category C
- Fire Resistance Rating: Grade II
- Roof Cladding: Single-layer 0.6mm color-coated steel sheet
- Wall Cladding: 0.4mm color-coated steel sheet
- Steel Grades: Q235 Steel, Q355 Steel
Warehouse Dimensions & Foundation:
- Total Length: 180.0 m
- Total Width: 68.9 m
- Building Height: 7.67 m
- Foundation Type: Reinforced Concrete Independent Foundation
Sinosteel Luonai Simple Warehouse Construction Project EPC Contract
Other Products
Sinosteel Luonai Simple Warehouse Construction Project EPC Contract
Sinosteel Luonai Simple Warehouse Construction Project EPC Contract
Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1
Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1: Steel Structure Works for Plant 3#, 4#, and 5#
Sanon New Material Technology (Luoyang) Co., Ltd.
Project Scale:Upon completion, the plant will produce 60,000 tons per year of high-performance extractants.
Luoyang Huijing New Material Technology Co., Ltd.
Project Overview:This steel structure project spans from axis 1-1 to 1-20 (North to South) and axis 1-A to 1-G (West to East).
Yoshida New Materials Phase I Plant Project
Total Area: 17,000 m²
Plant 4# & 5#: 6,000 m² each
Luoyang Bearing Research Institute Project
Building Area: 17,451.30 m²
Building Height: 13.60 m
Luoyang LYC Bearing Co., Ltd. Project Case
Construction area : Luoyang
Construction area : 17451.3㎡
construction period : 30 weeks
Case Study of a 30,000-square-meter Steel Structure Factory
Construction area : Zhejiang
Construction area : 30000㎡
construction period : 26 weeks
Construction area : Zhejiang
Construction area : 26500㎡
construction period : 16 weeks
Construction area : South Africa
Construction area : 320㎡
construction period : 8 weeks
Construction area : Indonesia
Construction area : 120㎡
construction period : 1 week
Large Span Prefabricated Warehouse Steel Structure Aircraft Hangar
Construction area : Spain
Construction area : 1000㎡
construction period : 22 weeks
I want to inquire
During your browsing of our products, is there anything that you find particularly satisfactory or that needs improvement? Your inquiries or suggestions will directly help us improve product and service quality, bringing you a more intimate experience.
* Please fill in the above fields (* indicates required fields), and we will reply to your feedback as soon as possible.

WeChat