Luoyang Huijing New Material Technology Co., Ltd.

Project Overview:This steel structure project spans from axis 1-1 to 1-20 (North to South) and axis 1-A to 1-G (West to East).

Category:

Details

Project Overview:
This steel structure project spans from axis 1-1 to 1-20 (North to South) and axis 1-A to 1-G (West to East).

 

Dimensions:

  • North-South Length: 149.7 m (Column spacing: 7.8 m)
  • East-West Width: 52.90 m

 

Structural Components:

  • Maximum Single H-Shaped Steel Column Component Weight: 6.9 tons
  • Maximum Component Height: 17.8 m
  • Structure Type: Single-story steel structure industrial workshop
  • Number of Above-Ground Floors: 1 Floor
  • Foundation Type: Independent Foundation

 

Column Connections:

  • Main H-Shaped Steel Columns: Connected via a cup-type connection embedded within the top surface of the concrete cup foundation, with cast-in-place reinforced concrete for rigid fixation.
  • Wind-Resistant Columns: Connected to the independent foundation via anchor bolts at the top surface.

 

Materials & Finishing:

  • Steel Grade: Q355 / Q235
  • Surface Preparation / Derusting Grade: Sa 2.5级 (Near-White Metal Blast Cleaning)

 

Luoyang Huijing New Material Technology Co., Ltd.

Other Products

Sinosteel Luonai Simple Warehouse Construction Project EPC Contract

Sinosteel Luonai Simple Warehouse Construction Project EPC Contract
Project Location: No. 1 Luonai Avenue, Yichuan County, Luoyang City
Building Area: 12,160 m²
Building Height: 7.67 m
Total Construction Period: 60 Days
Main Structure Type: Portal Frame
Number of Above-Ground Floors: 1 Floor
Number of Underground Floors: None

Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1

Zezhou County Zhichuang Digital Logistics Industrial Park – Phase I, Section 1: Steel Structure Works for Plant 3#, 4#, and 5#
Project Location: South of Hongxing East Street, West of Planning Jingsan Road (Dongshu Area), Jincheng City
Building Area: 9,252 m²
Building Height: 9 m
Total Construction Period: 90 Days
Main Structure Type: Portal Frame
Number of Above-Ground Floors: 1 Floor
Number of Underground Floors: None

Sanon New Material Technology (Luoyang) Co., Ltd.

Project Scale:
Upon completion, the plant will produce 60,000 tons per year of high-performance extractants.
Total Investment: 600 million RMB

Luoyang Huijing New Material Technology Co., Ltd.

Project Overview:This steel structure project spans from axis 1-1 to 1-20 (North to South) and axis 1-A to 1-G (West to East).

Yoshida New Materials Phase I Plant Project

Total Area: 17,000 m²
Plant 4# & 5#: 6,000 m² each
Construction Location: Nancun Town, Zezhou County, Jincheng City
Structural Form: Light Steel Structure, Portal Frame
Frame Type: Three-span, six-slope roof
Eave Height: 11.30 m
Total Length: 83.40 m
Total Width: 72.70 m
Roof Slope: 1:20
Foundation Type: Reinforced Concrete Independent Foundation
Plant 2# & 3#: 2,500 m² each
Material Specifications:
Portal Frame: C355B Grade Steel
Bracing, Purlins, Wall Girts, Channel Steel, Angle Steel, Round Steel: Q235B Grade Steel
Unspecified Steel Components: Same as Portal Frame (C355B)

Luoyang Bearing Research Institute Project

Building Area: 17,451.30 m²
Building Height: 13.60 m
Total Construction Period: 210 Days
Main Structure Type: Portal Frame Structure
Number of Above-Ground Floors: 1 Floor
Number of Underground Floors: None

Luoyang LYC Bearing Co., Ltd. Project Case

Building Area (m2): 17451.30
Building Height (m): 13.60m
Total Construction Period (days): 210
Main Structure Type: Portal Steel Frame Structure
Number of Floors Above Ground: 1

Case Study of a 30,000-square-meter Steel Structure Factory

Construction area : Zhejiang
Construction area : 30000㎡
construction period : 26 weeks

Case of Zhecheng Artificial Cultured Diamond Steel Structure Factory: The Integration of Innovation and Efficiency

Construction area : Zhejiang
Construction area : 26500㎡
construction period : 16 weeks

Metal Carport Kits

Construction area : Indonesia
Construction area : 120㎡
construction period : 1 week

Large Span Prefabricated Warehouse Steel Structure Aircraft Hangar

Construction area : Spain
Construction area : 1000㎡
construction period : 22 weeks

C & Z Purlins

Our C & Z purlin serves as fundamental structural elements crucial for providing support in construction projects. These purlins are meticulously engineered from robust materials, ensuring optimal strength and stability for roofing and wall systems. Available in a range of sizes and configurations, they offer versatility to accommodate diverse construction requirements. With their durable construction, our C & Z purlin guarantees dependable support and enhances the overall structural integrity of your building projects.

I want to inquire

During your browsing of our products, is there anything that you find particularly satisfactory or that needs improvement? Your inquiries or suggestions will directly help us improve product and service quality, bringing you a more intimate experience.

Submit

* Please fill in the above fields (* indicates required fields), and we will reply to your feedback as soon as possible.